Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13659993
![](http://i.b2b168.com/e/tag_pthy.gif)
- Product Categories
- Friendly Links
- home > Supply > Anhui brick beams latest price | Anhui brick Leung | Li Xin Liang advantage to change the wall
Information Name: | Anhui brick beams latest price | Anhui brick Leung | Li Xin Liang advantage to change the wall |
Published: | 2015-03-10 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | The transformation process carried out in the wall of the housing reform in Anhui Liang Liang brick company, you need to pay attention to the following precautions. 1, pre-construction management personnel should participate in concrete work, carpentry, reinforcing steel bar and other construction personnel to carry out safety tests, chiseled. Improve the safety awareness of employees, increase investment in security defense, so that facility safety, security checks in a timely manner, to improve the security system, a clear reward and punishment system. 2, enter the construction site must wear a helmet, non-construction personnel shall not enter the site. Aerial Work should wear non-slip shoes, wearing a seatbelt; using hand-held power tools must wear insulated gloves. Hammer after a period of rest to be interrupted to prevent overheating hammer, causing leakage accident. 3, all construction personnel is strictly prohibited illegal operation, illegal command, in violation of safety labor discipline, earnestly implement the various types of safety procedures in this type of work, careful organization and construction. 4, the implementation of three power distribution and secondary leakage protection, a machine, a gate, a drain, a box. Leakage protection switch box rated residual operating current is less than 15mA, residual operating time should not be greater than 0.1s wall Anhui latest price changes beams, hand-held power tools (hammer) and field lighting must use three-core cable. 5, when the co-workers chiseled concrete, should stand in the same direction, opposite the opposite prohibit construction, concrete blocks and construction tools to prevent accidental injury splashes across the operating personnel. Concrete must be dismantled before the garbage clean template Slab Slab of concrete after removal. Various steps of the wall beams are ready to change so that we can work to play a multiplier effect, improving the efficiency of our work, and then bring great benefits to us, here we take a look at how to properly conduct Wall to change the beam. 1 stick pouring concrete in general, there is a small section of the thickness of the stick Wang Ning, templates and former member of coagulation between the last rib surface also cloth cases, it is difficult to make concrete pouring dense, and therefore should be segmented pouring four times the number of hard feed according to the actual situation to determine the well should be fully supported vibration. 2, the interface treatment combines concrete surface should be chiseling or labeled as trench digging a ditch tip bar mill, which direction should be perpendicular to the direction of the force components. Probe is about 4 degrees a 6mm, when using blue or four sides fresh concrete floor beams when outsourcing to Anhui brick beams, steep should chisel cut beams and angle in addition to the shuttle. After completing the above steps, Anhui brick beam construction team should remove loose material points. Dross, dust, and by eliminating the pressure of clean water rinse will combine face-clean 'if using spray coagulation ten technology, yet the application of compressed air and Rinse water alternating ten net. 3. The removal of the template Moban demolition top coat will be concrete to meet the design or specification before proceeding seeking release when playing strength. Column template should stick second class degree can guarantee its surface and edges when not suffer any damage due to Chaimo before demolition; wall formwork must be reached on the strength of the coagulation 1.2MP, which may be removed; plate and beam formwork of Chaimo playing strength should meet the design requirements. Anhui brick beams latest price | Anhui brick Leung | Li Xin Liang advantage to change the wall by wall Nanyang City, Xin Li Liang provide change. Nanyang City walls change Liang Xin Li (www.hnqtgl.com) (www.hnqtgl.com) strong, credible, Henan Nanyang construction industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Xin Li Liang and you work to change the wall into the brilliant, for a better future! You can also access (www.hnqtgl.com/supply_details_44887935.html), for more information about the company. |
Admin>>>
You are the 22815 visitor
Copyright © GuangDong ICP No. 10089450, Nanyang City walls change Liang Xin Li All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22815 visitor
Copyright © GuangDong ICP No. 10089450, Nanyang City walls change Liang Xin Li All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility