Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13659993
![](http://i.b2b168.com/e/tag_pthy.gif)
- Product Categories
- Friendly Links
- home > Supply > Anhui wall change Beam Company, Anhui wall beams change, change Liang Xin Li walls assured professional
Anhui wall change Beam Company, Anhui wall beams change, change Liang Xin Li walls assured professional
Information Name: | Anhui wall change Beam Company, Anhui wall beams change, change Liang Xin Li walls assured professional |
Published: | 2015-04-23 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Under what circumstances changed frame beam? (1) can be understood from the conceptual framework and the framework of the beam shall constitute the framework column, Anhui walls to resist horizontal forces to change the beam, are areas of Anhui wall architecture team to change the beam, the beam must therefore frame and the frame to form a rigid column junction nodes. In the overall force, except by the vertical load, the formation of an effective system of horizontal loads, so there are a lot of frame beam construction measures. Than the stiffness of the beam and column lines is greater than 5:00, Anhui wall frame structure calculation basis having to change the beam engineering, frame beams and columns to resist horizontal forces; (2) a non-frame beam is than when COLUMN RIGID degrees in less than 5 relatively defined by multi-span continuous beam compute nodes for the former and the column just finished, which is supported on the wall or frame beam Anhui wall beam technology change is good, considering its bearings by articulation. Non-frame beam main vertical load to bear, do not provide horizontal stiffness; (3) whether or not to frame beams, whichever is best to design drawings, frame beams with non-frame beam calculation settings in the software, the node set is slightly different, take the appropriate node should be based on the drawings, design specifications shall prevail. Change the beam girder wall construction is very important. In the construction industry, reinforced concrete construction has a very clear when the relevant provisions. Because the beam is very important structures, if the beam does not build good, the impact of the building is still very large. So come with us today? A brief look at the technical provisions girder. Construction of the wall to change the beam girders change in accordance with the provisions of the first anti-corrosion and water-resistant coating. The process is generally carried out in the manufacture steel - steel installation - were pouring concrete - concrete conservation - external layer fire protective coating. Anhui wall change Beam Company, Anhui wall beams change, change Liang Xin Li wall professional assured by Xin Li Nanyang wall beams provide change. Nanyang City walls change Liang Xin Li (www.hnqtgl.com) (www.hnqtgl.com) strong, credible, Henan Nanyang construction industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Xin Li Liang and you work to change the wall into the brilliant, for a better future! |
Admin>>>
You are the 22815 visitor
Copyright © GuangDong ICP No. 10089450, Nanyang City walls change Liang Xin Li All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22815 visitor
Copyright © GuangDong ICP No. 10089450, Nanyang City walls change Liang Xin Li All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility