Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13659993
![](http://i.b2b168.com/e/tag_pthy.gif)
- Product Categories
- Friendly Links
- home > Supply > Wall beam engineering change | change Liang Xin Li Wall (certified) | Pingdingshan wall beams change
Wall beam engineering change | change Liang Xin Li Wall (certified) | Pingdingshan wall beams change
Information Name: | Wall beam engineering change | change Liang Xin Li Wall (certified) | Pingdingshan wall beams change |
Published: | 2015-04-25 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Wall major change beam suitable for use in a modern housing design space structures unreasonable, to provide professional home renovation project. Today we'll take a look at the specific methods and steps to change the wall beams. Before the wall beams change, we must first conduct a detailed site survey houses, make a detailed plan based on geographic location, structure housing. To be able to carry out a formal construction. First with the support of the wall will need to knock down walls to change the beam prop, mainly to replace the original wall to bear weight. In order to avoid the removal of the wall when the roof collapsed. In determining the steady support of the wall can be carried out after the demolition, the demolition of the wall when the beam engineering change, usually with large machines rarely work, because it would destroy the house of shock resistance and stability. After the removal of the wall will need to fight on both sides of the wall post. After determining the stability, with a special machine will beam to flow better, fixed beam. After 15 days, etc. (do slightly different seasonal adjustment according to) the removal support and templates. Re-paint the walls were changed much money beams, walls and beams to complete the change. Load-bearing beams or changed during the in-situ method using axial compression when to change the beam, with a measuring point on the wall of the wall should not be more than one team to change the beam, and the change in the beam in the wall in situ axial compression method measurement points should be located in the middle of the wall in the longitudinal direction, but also to ensure that changes in the wall on each side of the beam between the masonry wall slot width of not less than 1.5m; if more than one measuring point, each measuring point horizontal spacing of not less than 2.0m. In the vertical direction, changing beams where the test site should be away from the floor, the ground around 1m, the test site shall be selected in the cantilever beam, stress concentration and wall Wall Beam height range. When the wall or facade beams change when change supermarkets for testing in situ axial compression method, first dug in the measuring point position, relative of two horizontal slots. Should be carried out in a modified slotted beam to avoid disturbing the surrounding masonry, masonry bearing surfaces between the top and bottom of the groove should repair the flat. Second, change the wall beam or girder or is it time to change the facade of the supermarket these programs during the press should be placed between the slots in situ, in which the reaction force plate should be placed on Slots, flat jacks placed under Slots, and should be on the top surface of the lower surface of the tank and flat jack, and even laying around 10mm thick wet sand or plaster cushion; installation of four steel rod change when the beam, so that the two pressure plates ( reaction force plate and flat jack) down aligned in a horizontal position, four steel rod on the lower nut spacing should not exceed the difference between 2mm. Wall beam engineering change | change Liang Xin Li Wall (certified) | Pingdingshan wall changed by Liang Xin Li Nanyang wall beams provide change. Nanyang City walls change Liang Xin Li (www.hnqtgl.com) (www.hnqtgl.com) is an industry leader in Nanyang, Henan, construction, over the years, the company implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, the maximum to meet customer needs. Liang Xin Li walls change in leadership with the staff warmly welcome all inquiries negotiations to create change Liang Xin Li wall a better future. |
Admin>>>
You are the 22815 visitor
Copyright © GuangDong ICP No. 10089450, Nanyang City walls change Liang Xin Li All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22815 visitor
Copyright © GuangDong ICP No. 10089450, Nanyang City walls change Liang Xin Li All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility