Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13659993
- Product Categories
- Friendly Links
- home > Supply > Which Shiyan elevated bungalow | change Liang Xin Li Wall (certified) | Bungalow rise
Information Name: | Which Shiyan elevated bungalow | change Liang Xin Li Wall (certified) | Bungalow rise |
Published: | 2015-05-23 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | How to tell the load-bearing walls it: more homes on the general design drawings marked to distinguish the thick solid line portion and the ring beam structure Central Africa under the beam bearing walls are load-bearing walls; and neighbors shared walls and load-bearing wall also belongs. We better not transform for load-bearing walls. For non-load bearing walls, although the effect is not too big, but it's designed with seismic capacity, should pay special attention to the transformation of the time. Change change girder wall beams according to the following steps to achieve: 1 at the same height of the wall, open a hole in the wall several, put support in the hole in the wall - the wall changed beam; 2 while increasing support, and make. increased support same height, hole in the wall separating the upper and lower walls - walls change beam; 3 in the wall separating at Bricks on - wall to change beam;. [Henan Workers wall beams provide change] 4. And then at the same time raised the same height so that the wall, and then build the brick - wall beams change; 5 replacement anchor Hubei bungalow increased technical Which is better, to begin to open up a hole in the wall with a brick; f Repeat the above steps. Housing reach a height requirement so - Wall changed beam; 6 Remove the support, and then assemble bricks to fill the gap, repainted. Compared with the existing technology, and material, short construction period, the advantages of low cost - the walls change beams. Beam to achieve change through walls houses increased. Housing walls change beams to destroy the first side wall support with support bearing capacity to live above the wall to replace the role to be destroyed, and at the top of the original wall beams together, marked in the original wall column, use something related to fixed beams. Then after a certain period of time, the relevant things and get rid of Zhengzhou bungalow increased support, repainted enough. Remove related stuff and support time is about fifteen days, summer and winter time is not the same Shiyan bungalow increased, as the case may be, treat specific conditions. Change the beam in the wall when raised bungalow, just find a professional home renovation construction team, regardless of load-bearing walls can be assured that the transformation of motionless, as professional construction team they are very professional, does not destroy the structure of the house. Which Shiyan elevated bungalow | change Liang Xin Li Wall (certified) | bungalow increased from Nanyang City, Li Xin Liang walls provide change. Nanyang city walls change Liang Xin Li (www.hnqtgl.com) (www.hnqtgl.com) is an industry leader in Nanyang, Henan, construction, over the years, the company implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, the maximum to meet customer needs. Liang Xin Li walls change in leadership with the staff warmly welcome all inquiries negotiations to create change Liang Xin Li walls better future. |
Admin>>>
You are the 22815 visitor
Copyright © GuangDong ICP No. 10089450, Nanyang City walls change Liang Xin Li All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22815 visitor
Copyright © GuangDong ICP No. 10089450, Nanyang City walls change Liang Xin Li All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility